标题:Application of combination methods to estimating building separations in taiwan
作者:Lin, Jeng-Hsiang
通讯作者:Lin, JH
作者机构:[Lin, Jeng-Hsiang ] Department of Architecture, Hwa Hsia Institute of Technology, No.111, Gongjhuan Rd., Jhonghe City, Taipei County 23568, Taiwan
会议名称:2011 International Conference on Civil Engineering and Transportation, ICCET 2011
会议日期:October 14, 2011 - October 16, 2011
来源:Applied Mechanics and Materials
出版年:2011
卷:90-93
页码:1593-1596
DOI:10.4028/www.scientific.net/AMM.90-93.1593
摘要:The combination method implied in the formula used to evaluate the building separation to avoid seismic pounding in current Taiwan Building Code (TBC) is the absolute sum (ABS) method. However, it was demonstrated that the ABS method is not satisfactory. in this study, the seismic pounding risk of buildings is used as an indicator to demonstrate the validity of application of various combination methods to the formula in the pounding related provisions of TBC. The result shows that the building separations based on these combination methods generally provide relatively conservative estimate due to an overestimate property line setback. © (2011) Trans Tech Publications.
收录类别:EI
资源类型:会议论文
TOP