标题:Study on the treatment and settlement monitoring technology of passenger dedicated line collapsible loess foundation
作者:Liu, Fu Chun ;Su, Hui Feng ;Wang, Qiu Chun
作者机构:[Liu, Fu Chun ] China Railway 19th Bureau Group 2nd CO., LTD, Liaoyang, Liaoning 111000, China;[Su, Hui Feng ;Wang, Qiu Chun ] College of Transportati 更多
会议名称:4th International Conference on Civil Engineering, Architecture and Building Materials, CEABM 2014
会议日期:May 24, 2014 - May 25, 2014
来源:Applied Mechanics and Materials
出版年:2014
卷:584-586
页码:1951-1955
DOI:10.4028/www.scientific.net/AMM.584-586.1951
摘要:By the engineering background of Datong-Xian Passenger Dedicated Railway Line passing through the collapsible loess area, four representative test sections such as roadbed-bridge transition section, roadbed-culvert transition section, ordinary and special embankment section was selected. Different pile parameter and pile plane layout and subgrade filling measure has been taken according to the different test sections. At the same time, the correspondence of settlement monitoring project was carried out. After the long time monitoring, by the hyperbolic curve and logarithmic method predicting, the long-term settlement has been predicted. The monitoring results and the curve fitting shows that the settlement and the foundation treatment schemes with subgrade filling measurement meet the design requirement also provided reference and reference for other engineering. © (2014) Trans Tech Publications, Switzerland.
收录类别:EI
资源类型:会议论文
TOP