标题:Research on the black start field test of shandong power grid based on PDCA cycle
作者:Wang, Hongtao ;Liu, Yutian
通讯作者:Wang, H
作者机构:[Wang, Hongtao ;Liu, Yutian ] School of Electrical Engineering, Shandong University, Jinan, China
会议名称:International Conference on Electrical and Control Engineering, ICECE 2010
会议日期:26 June 2010 through 28 June 2010
来源:Proceedings - International Conference on Electrical and Control Engineering, ICECE 2010
出版年:2010
页码:4144-4148
DOI:10.1109/iCECE.2010.1006
关键词:Black start; Emergency management; PDCA cycle; Power system restoration
摘要:Due to the lack of effective mechanism of black start experiment with continuous improvement in power system, the black start experiment management of PDCA mode is proposed according to the risk management mechanism, accident priority control and continuous improvement implementation principles. Shangdong power grid black start experiment is implemented successfully with the standardization management. In the Planning stage during implementation of PDCA cycle management, three risk factors including abnormal parameters of the pumped-storage unit with low load, DC power shortage for breaks and issues of synchronism parallel operation are early detected and eliminated through rectification with several phases. In the Doing stage, test is implemented with four steps including adjustment of operation mode, shutdown of units, black start test and restoration of subsystem. Time is controlled accurately during test procedure. In the Checking stage, the black start ability of pumped-storage unit and large thermal power unit is analyzed with recording data of test. Test objectives are fully verified. In the Action stage, prior schemes of black start are revised. Test plan and dispatching operation are developed for the next cycle. Following the PDCA pattern, the high-risk large-cost experiment involving wide scopes realizes the closed-loop management with feedforward control, concurrent control and feedback control. It effectively guarantees the smooth implementation of the experiment. Moreover, the continuous improvement action promotes black start capabilities to be more in line with actual requirements. © 2010 IEEE.