标题:Optimization research of stope structural parameters in upward drift cut-and-backfilling mining method
作者:Zhu, Pi-Kai ;Zhao, Jing-Qing
作者机构:[Zhu, Pi-Kai ] College of Mining and Safety Engineering, Shandong University of Science and Technology, Qingdao 266510, China;[Zhu, Pi-Kai ;Zhao, Jing 更多
会议名称:2nd International Conference on Advances in Energy and Environmental Science, ICAEES 2014
会议日期:June 21, 2014 - June 22, 2014
来源:Advanced Materials Research
出版年:2014
卷:1010-1012
页码:1454-1460
DOI:10.4028/www.scientific.net/AMR.1010-1012.1454
摘要:Focus on a -400m level stoping in a gold mine, the ANSYS numerical software was used to study the stope structural parameters in upward drift cut-and backfilling mining methods. First, according to engineering experience, the design of stope structural parameters was obtained. Then the stoping process of both the first drift and the second drift was simulated by the numerical software. The vertical maximum displacement and the vertical maximum stress were selected as evaluation indexes for analysis. The result shows that the third project, whose drift width is 4 m and layer height is 3 m, have the best effect with the less displacement and stress compared with other projects. © (2014) Trans Tech Publications, Switzerland.
收录类别:EI
资源类型:会议论文
TOP