标题:Dispatch Problems Due to Ramp Rate Constraints: Bottleneck Analysis and Solutions
作者:X. S. HAN;H. B. GOOI;B. VENKATESH
作者机构:[Han, X.S] School of Electrical Engineering, Shandong University, Jinan City, China;[ Gooi, H.B] Sch. of Electric and Electron. Eng., Nanyang Technica 更多
通讯作者:Gooi, HB
通讯作者地址:[Gooi, HB]Nanyang Technol Univ, Sch Elect & Elect Engn, S Spine,Block S1,Nanyang Ave, Singapore 639798, Singapore.
来源:Electric Power Components and Systems
出版年:2003
卷:31
期:10
页码:995-1006
DOI:10.1080/15325000390234463
关键词:dynamic economic dispatch;ramp rates;system ramp MW;unavailable ramp MW
摘要:This paper proposes a dispatch technique based on the analysis of the system ramp-up/down megawatts (MW). If a dispatch is feasible, it can be shown that the total unavailable ramp-up MW of all the slow units in any future time intervals must be less than or equal to the MW difference between the maximum system MW capacity and the load demand at the end of study intervals. Like/wise, the same can be said for the total unavailable ramp-down MW of all the slow units. These two constraints can be used to guide the system away from infeasible dispatch.