标题:Two-Layers CE Algorithm for Flexible Job Shop Scheduling Problem with Electric Power Cost Considered
作者:Wang, G. R.; Li, Q. Q.
通讯作者:Li, QQ
作者机构:[Wang, G. R.] Shandong Univ, Jinan 250100, Shandong, Peoples R China.; [Wang, G. R.] Shandong Jianzhu Univ, Minist Educ, Key Lab Bldg Renewable Ener 更多
会议名称:International Conference on Industrial Technology and Management Science (ITMS)
会议日期:MAR 27-28, 2015
来源:PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON INDUSTRIAL TECHNOLOGY AND MANAGEMENT SCIENCE (ITMS 2015)
出版年:2015
卷:34
页码:432-435
关键词:Cross entropy; FJSP; Scheduling; Electric power cost
摘要:Propose a Two-Layers CE algorithm to solve flexible job shop scheduling problem. Two optimal objectives are considered: makespan and electric power cost. Analyze the influence of different values of the weight vector to the two objectives. Different simulation instances with different problem scale are devised to validate the superior performance of the algorithm.
收录类别:CPCI-S
资源类型:会议论文
TOP